Thursday, September 5, 2013

[Video] Crane leaned down at Reactor3

[Video] Crane leaned down at Reactor3

http://fukushima-diary.com/2013/09/video-crane-leaned-down-at-reactor3/?utm_source=feedburner&utm_medium=feed&utm_campaign=Feed%3A+FukushimaDiary+%28Fukushima+Diary%29



According to Tepco, the remote controlling 600 tones crawler crane leaned down beside reactor3.
Tepco reports it didn’t cause any damage on reactor3 building, data shows no abnormality.
The cause is not verified.
At 8:35 AM of 9/5/2013, the operator observed the crane gradually leaned. It is located on the west side of reactor3 building.
A crack was found on the joint part for the main mast and jib.

↓ Video of the moment when the crane leaned. (1:33~)



Crane leaned down at Reactor3



You can ignore the truth but the truth won’t ignore you.
 
Note from Solsticewitch =
 Here is a paper on metal fatigue  due to radiation a Poster at ENENEWS.COM just shared,,
 http://ir.lib.uwo.ca/cgi/viewcontent.cgi?article=2404&context=etd
 

No comments:

Post a Comment